Monday, March 22, 2010

Basement Wall


In the planning stages of the basement digout. Met with a contractor this weekend. Spring is already in the air.

Tuesday, March 16, 2010

Kitchen Wrap Up


Kitchen runner by Flor and cabinet modifications near complete. Range installed, plumbed, wired & cooking meals. Minor electrical performed in kitchen adding a microwave outlet & deleting the old range outlet.

Next on 'the list' is to install
stainless backsplash, vent hood, and then a basement slab.

Sunday, March 7, 2010

Guys dream too...



Dreaming of a concrete floor in the basement, my new Ridgid table saw, and a Kreg jointer.

Of course, a compressor, sliding compound mitre saw, router table, and edge bander wouldn't hurt either.

Monday, March 1, 2010

Counters, Cabinets + Richard Nixon

Progress! Phase 1 kitchen became a reality this weekend with about 3.5 days worth of work occurring in just over 1. The new wood counters got installed, the cabinets were modified to accept the new(ish) 36" range, and the hood was installed. The range still needs to be plumbed (Jim the plumber, if, by the grace of god you're reading this, please call me back), and an electric outlet or two added. Hopefully the existing 220 line for the old electric range will be running my own personal table saw someday as opposed to me needing to constantly 'borrow' my neighbors shop.

I had my 2 carpenters bring a laborer with them that basically worked 12 hours on Saturday emptying out the cottage & basement. Yes, we filled a 20 yard dumpster to the brim and I couldn't be more proud. Quite a cleansing experience. A real refuse enema.



Note how the cabinet over the hood had to be 'stretched' six inches and the cabinet to the right 'shrunk' by six inches. Stainless steel splash guard coming soon. I suppose the hood needs to be vented as well, huh? It's on the list.


I'm a sucker for red knobs.